Description
Tired of inefficient water pumps that consume a lot of energy and fail to deliver satisfactory performance for your large water features or fountains? The Oase Aquarius Eco Expert Fountain Pump is your one-stop solution for all your water pumping requirements.
This powerful pump is designed to deliver a high volume of water with a maximum head height of 10m in an energy-efficient manner, consuming 50% less energy than its previous model. With market-leading technology, the Oase Aquarius Eco Expert Fountain Pump is packed with features that ensure superior performance and longevity.
Thanks to its easy connection to the Oase EGC Control, you can now control the pump from an app on your smartphone or tablet. Plus, with the built-in DFC Dynamic Function Control, you can create different water patterns to add even more visual interest to your water feature or fountain.
You can rely on the Oase Aquarius Eco Expert Fountain Pump to deliver exceptional results and transform your water feature or fountain into a mesmerizing display of beauty and power.
Key Features:
- Energy efficient motor
- Ideal for large water features
- EGC Control for internet networks
- High-volume delivery of up to 10m
- 50% less energy consumption
- Market-leading technology
- Customizable water patterns with DFC
- Energy-efficient motor
- 10m cable length
- Durable construction
- Easy installation and maintenance
- 3-year plus 2-year guarantee when the product is registered online
Specifications Aquarius Eco Expert 22000:
- Dimensions: Length 49cm x Width 21.5cm x Height 23.5cmÂ
- Power consumption: 350W
- Max. flow rate: 22000l/h
- Max. head height: 9.60m
- Hose connection: 1 Â ½", 2"
- Setup Type:Â Can be set up underwater & dry installed
Specifications Aquarius Eco Expert 28000:
- Dimensions:Â Length 49cm x Width 21.5cm x Height 23.5cmÂ
- Power consumption: 440W
- Max. flow rate: 27900l/h
- Max. head height: 10.00m
- Hose connection: 1 Â ½", 2"
- Setup Type:Â Can be set up underwater & dry installedÂ
Specifications Aquarius Eco Expert 36000:
- Dimensions: Length -Â 54cm x Width -Â 22.5cm x Height -Â 25cm
- Power consumption: 550W
- Max. flow rate: 36000l/h
- Max. head height:Â 10.20m
- Hose connection:Â 1 Â ½", 2"
- Setup Type:Â Can be set up underwater & dry installed
Specifications Aquarius Eco Expert 44000:
- Dimensions:Â Length -Â 54cm x Width -Â 22.5cm x Height -Â 25cm
- Power consumption: 700W
- Max. flow rate: 44000l/h
- Max. head height: 10.50m
- Hose connection:Â 1 Â ½", 2"
- Setup Type:Â Can be set up underwater & dry installed









